← Back to projectsOn Track
Riyadh Residential Tower
Riyadh, KSA · Residential High-Rise · Client: Al Faisaliah Holding

32-floor residential tower with retail podium in North Riyadh.
Overall progress62%
Key Facts
- Contractor
- Saudi Binladin Group
- Budget
- SAR 480M
- Start
- 2024-03-12
- End
- 2026-10-30
- Health
- 86%
- Open issues
- 7
- Delay
- 0 days
Tasks
- Pour concrete – Level 18In Progress
- Lift shaft survey – Tower 1In Progress
Issues
- Concrete cube strength below spec – Pour 42High
- Façade panel dimensional mismatch – L12High
Site Reports
SR-2210 — 2026-05-22
Slab L18 reinforcement 70% complete.
SR-2215 — 2026-05-20
L17 façade panels installation in progress.
Documents
- IFC Drawings – Tower Rev D.pdf24.1 MB
- Inspection Report – Slab Pour 42.pdf1.8 MB